Energy for Luxemburg

last updated: 2024-01-01

PV monthly data Mersch

As from 2022-2023

In 2022 I installed a battery (48 V, 60 kWh) and an 3 phase 24 kVA energy storage system (ESS) from Victron.

A 4 kWp unit from 2002 on the east roof was disconnected from the grid in August 2022 and reconnected to the battery (DC-DC). In June 2023 I replaced the 4 kWp from 2002 on the south roof with a new 11 kWp unit (connected to the battery). I also added a 4.9 kWp unit on the garage (battery) and disconnected a 2.7 kWp unit from the grid and reconnected it to the battery.

So after 2023 four units (4 kWp, 2.7 kWp, 11 kWp and 4.9 kWp) are connected to the battery and one unit (10 kWp from 2017 is connected to the output of the ESS system (DC-AC, 3 phase).

  1. Unit 2002: 4 kWp, angle of inclination 30° azimuth -75° (75° east) to battery
  2. Unit 2008: 2.7 kWp angle of inclination 19° azimuth +15° (15° west) to battery
  3. Unit 2017: 2x5 kWp angle of inclination 10° azimuth +90/-90° (east/west) to AC output ESS 3p
  4. Unit 2023: 11 kWp, angle of inclination 45°, azimuth +15° (15° west) to battery
  5. Unit 2023: 4.9 kWp, angle of inclination 45°, azimuth +15° (15° west) to battery

Before 2023

For the data on this page before 2023 (no battery):

  1. Unit (WG) 2002: 4 kWp, angle of inclination 45°, azimuth +15° (15° west)
  2. Unit (WP) 2002: 4 kWp, angle of inclination 30° azimuth -75° (75° east)
  3. Unit (WK) 2008: 2.7 kWp angle of inclination 19° azimuth +15° (15° west)
  4. Unit (AU) 2017: 2x5 kWp angle of inclination 10° azimuth +90/-90° (east/west)

Click the picture to get a higher resolution! Right-click ("Save Link As..") to download.

Monthly data:

month 2023
month 2022
month 2021
month 2020
month 2019
month 2018
month 2017
month 2016
month 2015
month 2014
month 2013
month 2012
month 2011
month 2010
month 2009
month 2008
month 2007
month 2006
month 2005
month 2004
month 2003
month 2002